Remote or stranded gas
Consider where a pipeline connection is unavailable, delayed or uneconomic, subject to technical and commercial review.
Could modular LNG help make remote or associated gas transportable where a pipeline connection is difficult? IMEX-Solutions is exploring project opportunities with qualified technology, engineering and commercial partners.
Liquefied natural gas (LNG) is natural gas cooled to a cryogenic liquid. Liquefaction can make gas much more compact for storage and transport, but it requires prepared feed gas, energy, specialist equipment and a viable route to market.
Consider where a pipeline connection is unavailable, delayed or uneconomic, subject to technical and commercial review.
Screen gas that is currently underused or flared, with careful attention to flow variability, contaminants and existing site systems.
Assess storage, loading, road or other transport logistics, receiving infrastructure and a committed end user.
Plant configuration and equipment selection must come from the process licensor and engineering team after the feed gas and site have been assessed.
Measure feed-gas composition, pressure, temperature, flow range and operating profile.
Remove water, acid gases and other components as required by the selected liquefaction process.
Cool the prepared gas through a suitable refrigeration process to produce LNG.
Provide cryogenic storage, boil-off management, loading and a safe delivery or use route.
IMEX-Solutions is seeking discussion with experienced organizations that can evaluate, develop and deliver a technically sound project.
Process technology, packaged units, gas pretreatment, controls, commissioning and lifecycle support.
Access to feed gas data, site conditions, operating requirements, permits and an identified gas-utilization need.
Demand, storage, loading, transport, receiving infrastructure, commercial structure and project finance.
IMEX-Solutions can help organize an initial opportunity screen, bring together relevant industrial and market stakeholders, and coordinate the information needed for a qualified feasibility study. Process design, equipment guarantees, permitting and construction would remain with the selected qualified partners.
A short, non-confidential screening can identify data gaps before partners begin detailed engineering. Do not send sensitive field data until an appropriate confidentiality arrangement is in place.
Average, minimum and peak flow; variability and decline; pressure and temperature; hours of operation; composition including CO2, H2S, nitrogen, water, heavy hydrocarbons and mercury where available.
Location and access; available power and fuel; existing separation, compression and gas treatment; plot space; ambient and environmental conditions.
Potential LNG demand; storage and loading plan; transport distance and mode; receiving facilities; local permits, codes and safety requirements.
LNG systems involve cryogenic temperatures, flammable gas, pressure equipment and site-specific hazards. A qualified design and risk-review process is essential.
Start with the country, gas source, estimated flow range and intended market.
These references provide general context. They do not replace applicable local codes, permitting advice or project engineering.
LNG basics, liquefaction and transport.
Read DOE overview ↗Mobile and modular gas utilization, mini-LNG and the challenges for small-scale associated gas projects.
Read IEA analysis ↗Emissions across the LNG supply chain and available abatement options.
Read IEA emissions report ↗